Yesterday I placed the big newegg order. So now 85% of the budget has been spent and all of the required parts are ordered! The other 15% of the budget will be charged soon and it includes the cooling for the gpu along with some mods that were supposed to have been included in version 1. I have also thrown in a cheep upgrade for my tv pc from a 9500 to a 220. This will greatly improve the quality of video playback.
Well it should come as no suprize that there was problems. It turns out that my second loops pump has a cut wire due to the way that it is transported. The pump will need to be replaced and the entire second loop rebuilt. Luckily it currently does not cool anything and so I will just remove it and continue the build and hopefully be back soon.